Abstract

This TBR specifies those technical requirements under Article 4 of Council Directive 93/97/EEC [1] that apply to Mobile Earth Station (MES) equipment with both transmit and receive capabilities for operation in a Satellite - Personal Communications Network (S-PCN).  These MESs include handheld, portable and vehicle mounted equipment or may be a component in a multi-mode treminal; they may consist of a number of modules with associated connections and user interface, or may be self contained, single units. If the MES is a component in a multi-mode terminal, this TBR applies only to the MES component of the terminal, unless otherwise stated.  The frequency bands within which the MESs operate as as follows:  -1980-2010 MHz, (MES transmit) -2170-2200 MHz (MES receive).  The technical requirements in this TBR are in two major categories:  unwanted emission: to protect terrestrial and other satellite radio services from harmful interference generated by the MES in normal use;  MES control and monitoring: to speicfy the a minimum set of Control and Monitoring Functions (CMF) that shall be  implemented in each MES in order to minimise the probability that they originate unwanted transmissions that may give rise to harmful interference to other systems.  These requirements are taken from ETS 300 734 [3].  Network Control Facilities (NCF) for MES networks are defined by reference to  ETS 300 735 [2].  This TBR does not contain the essential requirements under articles 4f and 4g for interworking via the public telecommunications network, and does not provide any guarantee of correct interworking between MES equipment.  The Terminal Directive 91/263/EEC Articles 4a and 4b are covered by other Directives and therefore, are not covered by this TBR.

Status
Published
Publication Date
30-Sep-1999
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
01-Oct-1999
Due Date
01-Oct-1999
Completion Date
01-Oct-1999
Mandate
T-313

Buy Documents

Standardization document

SIST TBR 042:1999

English language (43 pages)
Preview
Preview
e-Library read for
×1 day

SIST TBR 042:1999 is the Slovenian standard identical to ETSI TBR 042 Edition 1, published by SIST. It specifies terminal essential requirements for Mobile Earth Stations (MES) used in Satellite Personal Communications Networks (S-PCN) in the 2,0 GHz bands under the Mobile Satellite Service (MSS). The document is aimed at applicants, manufacturers, suppliers, and test laboratories that need to assess MES equipment with transmit and receive capability, including handheld, portable, vehicle-mounted, host-connected, semi-fixed, fixed, and multi-mode implementations.

What does SIST TBR 042:1999 specify?

SIST TBR 042:1999 specifies the technical requirements that apply to MES equipment operating in the MSS uplink and downlink bands. The scope is centered on two practical topics: unwanted emissions and MES Control and Monitoring Functions (CMF), because these are the main ways an MES can interfere with other systems.

The standard is organized into clauses 1 to 9, with normative annexes that define how to test the equipment and how to interpret the results.

AnnexWhat it covers
Annex AGeneral test requirements, test modes, STE, LTE, measurement uncertainty, and test report content
Annex BEnvironmental conditions and testing of host-connected equipment
Annex CProcedures for radiated emissions measurements
Annex DProcedures for conducted emissions measurements
Annex EExplanation of nominated bandwidth
Annex FTBR Requirements Table
Annex GBibliography

The scope is limited to the MES radio interface. It focuses on terminal essential requirements for the S-PCN MES, not on public telecommunications network interworking.

What are the key requirements of SIST TBR 042:1999?

SIST TBR 042:1999 requires an MES to control its emissions, react safely to faults, and respond to network control. In practice, this means the equipment must stay within emission masks, shut down transmission when needed, and support conformance testing in repeatable test modes.

Unwanted emissions outside the operating band

Clauses 5.3 to 5.5 set limits for unwanted emissions outside the band 1 980,1 to 2 009,9 MHz while the MES is in carrier-on state. The limits vary by frequency range and use peak or average measurement methods, with specific measurement bandwidths.

For an engineer or test lab, this means the MES must be checked at the minimum and maximum transmit frequencies, at maximum transmit power, and with the specified test modulation. Radiated or conducted testing is allowed depending on the equipment configuration.

Unwanted emissions inside and near the operating band

Clause 6 sets tighter requirements close to the carrier, within 1 978,1 to 2 011,9 MHz. The limits depend on whether the carrier is TDMA or CDMA, and the offset is measured from the edge of the nominated bandwidth.

This matters because close-in emissions are the most likely to disturb other users of the same or adjacent spectrum. The standard requires the whole nominated bandwidth to stay inside the declared operational band.

Carrier-off emissions

Clause 7 covers unwanted emissions when the MES is powered on but not transmitting. The equipment must remain within the carrier-off emission limits across the defined spectrum.

In practice, this is the idle-state check. It helps confirm that a powered-on terminal does not radiate significant energy simply because it is switched on.

Control and Monitoring Functions

Clause 8 requires CMF that prevent uncontrolled transmission. The MES must monitor its processor and transmit frequency generation sub-system, detect failures, and suppress transmission after a fault is detected.

The same clause requires network control authorization: after POWER-ON, the MES must stay in a non-transmitting state until it is synchronized to the appropriate network control channel. It must also stop transmitting within 30 s after losing that channel.

Network control reception and multi-mode behavior

Clause 8.3.2 requires the MES to set its carrier frequency according to commands from the Network Control Facility (NCF). Clause 8.4 requires fellow radio stations in a dual-mode or multi-mode terminal not to transmit unless they receive the appropriate network control channel for their own system.

This is important for devices that combine several radio systems, because one mode must not start transmitting without network control just because another mode is active.

Equipment identity

Clause 9 requires each MES to have a unique MES Identification Code (MIC) within its S-PCN. The MIC must not be alterable by normal user actions, and the MES must transmit its identification code when an appropriate NCF command is received.

That gives the network a reliable way to identify the terminal during operation and testing.

Test setup and environmental coverage

Annexes A and B add practical test conditions. The MES is tested in defined test modes, under specified temperature, voltage, and vibration conditions, and host-connected equipment can be tested either as a combined system or with a representative test jig.

For buyers and quality managers, this matters because conformance is not just a bench check. The device must perform across declared operating conditions and in the configuration in which it will actually be used.

What terms does SIST TBR 042:1999 define?

  • Applicant - the party seeking approval or market placement of the S-PCN MES, usually the manufacturer, authorized representative, or supplier.
  • Carrier-on state - the MES is transmitting, whether the signal is continuous or intermittent.
  • Carrier-off state - the MES is powered on but not transmitting.
  • Control and Monitoring Functions (CMF) - the MES functions that monitor itself and respond to network control so it avoids causing unwanted transmissions.
  • Network Control Facility (NCF) - the network-side control function that sends commands to the MES.
  • Nominated bandwidth (Bn) - the frequency interval that contains the useful transmission and is used to define the unwanted-emissions mask.
  • Special Test Equipment (STE) - equipment used by the test laboratory to control the MES and provide the required network-control conditions during testing.
  • MES Identification Code (MIC) - the unique identification code assigned to an MES within its S-PCN.

Who uses SIST TBR 042:1999?

This standard is used by MES manufacturers, design teams, and their authorized representatives when they prepare equipment for approval or market placement. It is also used by accredited test laboratories that perform conformance testing of radiated and conducted emissions, control behavior, and identification response.

Network operators and system integrators use the concepts in the standard when they define the operational band, nominated bandwidth, and NCF behavior for an S-PCN. Quality managers and buyers use it to check whether a terminal is a handheld, portable, vehicle-mounted, host-connected, or multi-mode MES that can be tested and documented against the same essential requirements.

What changed in SIST TBR 042:1999 from the previous edition?

SIST TBR 042:1999 is identical to TBR 042 Edition 1.

Which standards are used with SIST TBR 042:1999?

  • CCITT Recommendation O.153 - defines the pseudo-random bit sequence used as the test modulating signal in Annex A.
  • ETS 300 734 - provides the related MES technical requirements referenced in the foreword and bibliography.
  • ETS 300 735 - defines the Network Control Facilities for S-PCN that generate the control commands used in CMF tests.
  • IEC Publication 68-2-1 - provides cold environmental test guidance used for temperature conditioning.
  • IEC Publication 68-2-2 - provides dry-heat environmental test guidance used for temperature conditioning.
  • IEC Publication 68-2-36 - provides random-vibration test guidance used in Annex B.

What does the SIST TBR 042:1999 document contain?

SIST TBR 042:1999 contains the full test-oriented structure needed to assess an MES against its essential requirements. Clause 4 explains how the equipment is presented for testing, including active antennas, host-connected equipment, and the information the applicant must supply. Clauses 5 to 7 define the emission masks and the measurement methods for carrier-on and carrier-off states.

The document includes detailed measurement procedures for radiated emissions in Annex C and conducted emissions in Annex D, with specific test arrangements and reference positions. Annex E explains how nominated bandwidth is interpreted, and Annex F maps the requirement topics to the TBR Requirements Table. The figures, tables, and procedures are written for conformance testing, not for product marketing descriptions or general background only.

Relations

Effective Date
01-Dec-2009

Buy Documents

Standardization document

SIST TBR 042:1999

English language (43 pages)
Preview
Preview
e-Library read for
×1 day

Get Certified

Connect with accredited certification bodies for this standard

ANCE

Mexican certification and testing association.

EMA Mexico Verified

Intertek Slovenia

Intertek testing, inspection, and certification services in Slovenia.

UKAS Slovenia Verified

LNE (Laboratoire National de Métrologie et d'Essais)

French national laboratory for metrology and testing.

COFRAC France Verified

Sponsored listings

Frequently Asked Questions

SIST TBR 042:1999 is a standardization document published by the Slovenian Institute for Standardization (SIST). Its full title is "Satellite Personal Communications Networks (S-PCN); Mobile Earth Stations (MES), including handheld earth stations, for S-PCN in the 2,0 GHz bands under the Mobile Satellite Service (MSS); Terminal essential requirements". This standard covers: This TBR specifies those technical requirements under Article 4 of Council Directive 93/97/EEC [1] that apply to Mobile Earth Station (MES) equipment with both transmit and receive capabilities for operation in a Satellite - Personal Communications Network (S-PCN). These MESs include handheld, portable and vehicle mounted equipment or may be a component in a multi-mode treminal; they may consist of a number of modules with associated connections and user interface, or may be self contained, single units. If the MES is a component in a multi-mode terminal, this TBR applies only to the MES component of the terminal, unless otherwise stated. The frequency bands within which the MESs operate as as follows: -1980-2010 MHz, (MES transmit) -2170-2200 MHz (MES receive). The technical requirements in this TBR are in two major categories: unwanted emission: to protect terrestrial and other satellite radio services from harmful interference generated by the MES in normal use; MES control and monitoring: to speicfy the a minimum set of Control and Monitoring Functions (CMF) that shall be implemented in each MES in order to minimise the probability that they originate unwanted transmissions that may give rise to harmful interference to other systems. These requirements are taken from ETS 300 734 [3]. Network Control Facilities (NCF) for MES networks are defined by reference to ETS 300 735 [2]. This TBR does not contain the essential requirements under articles 4f and 4g for interworking via the public telecommunications network, and does not provide any guarantee of correct interworking between MES equipment. The Terminal Directive 91/263/EEC Articles 4a and 4b are covered by other Directives and therefore, are not covered by this TBR.

This TBR specifies those technical requirements under Article 4 of Council Directive 93/97/EEC [1] that apply to Mobile Earth Station (MES) equipment with both transmit and receive capabilities for operation in a Satellite - Personal Communications Network (S-PCN). These MESs include handheld, portable and vehicle mounted equipment or may be a component in a multi-mode treminal; they may consist of a number of modules with associated connections and user interface, or may be self contained, single units. If the MES is a component in a multi-mode terminal, this TBR applies only to the MES component of the terminal, unless otherwise stated. The frequency bands within which the MESs operate as as follows: -1980-2010 MHz, (MES transmit) -2170-2200 MHz (MES receive). The technical requirements in this TBR are in two major categories: unwanted emission: to protect terrestrial and other satellite radio services from harmful interference generated by the MES in normal use; MES control and monitoring: to speicfy the a minimum set of Control and Monitoring Functions (CMF) that shall be implemented in each MES in order to minimise the probability that they originate unwanted transmissions that may give rise to harmful interference to other systems. These requirements are taken from ETS 300 734 [3]. Network Control Facilities (NCF) for MES networks are defined by reference to ETS 300 735 [2]. This TBR does not contain the essential requirements under articles 4f and 4g for interworking via the public telecommunications network, and does not provide any guarantee of correct interworking between MES equipment. The Terminal Directive 91/263/EEC Articles 4a and 4b are covered by other Directives and therefore, are not covered by this TBR.

SIST TBR 042:1999 is classified under the following ICS (International Classification for Standards) categories: 33.060.30 - Radio relay and fixed satellite communications systems. The ICS classification helps identify the subject area and facilitates finding related standards.

SIST TBR 042:1999 has the following relationships with other standards: It is inter standard links to SIST EN 301 442:2001. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

SIST TBR 042:1999 is associated with the following European legislation: Standardization Mandates: T-313. When a standard is cited in the Official Journal of the European Union, products manufactured in conformity with it benefit from a presumption of conformity with the essential requirements of the corresponding EU directive or regulation.

SIST TBR 042:1999 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Definitions and abbreviations
  • 3.1 Definitions
  • 3.2 Abbreviations
  • 4 General
  • 4.1 Presentation of equipment for testing purposes
  • 4.2 Description of equipment
  • 4.3 Host-connected equipment
  • 5 Unwanted emissions outside the band 1 980,1 to 2 009,9 MHz (carrier-on)
  • 5.1 Justification
  • 5.2 Purpose
  • 5.3 Conformance requirements
  • 5.4 Method of test
  • 5.5 Test requirements
  • 6 Unwanted emissions within the bands 1 980,1 to 2 009,9 MHz, 1 978,1 to
  • 6.1 Justification
  • 6.2 Purpose
  • 6.3 Conformance requirements
  • 6.4 Method of test
  • 6.5 Test requirements
  • 7 Unwanted emissions in carrier-off state
  • 7.1 Justification
  • 7.2 Purpose
  • 7.3 Conformance requirements
  • 7.4 Method of test
  • 7.5 Test requirements
  • 8 MES Control and Monitoring Functions (CMF)
  • 8.1 Special test equipment
  • 8.2 Self-monitoring functions
  • 8.3 Network control authorization and reception
  • 8.4 Fellow radio stations in a dual-mode or multi-mode terminal
  • 9 Equipment identity
  • 9.1 Justification
  • 9.2 Purpose
  • 9.3 Conformance requirements
  • 9.4 Method of test
  • 9.5 Test procedure
  • 9.6 Test requirements
  • Annex A (normative): General test requirements
  • Annex B (normative): Environmental conditions and host connected
  • 5 Hz to 20 Hz 0,96 m /s (+ 0/-5 %)
  • 20 Hz to 500 Hz 0,96 m /s (+ 0/-5 %) at 20 Hz, thereafter -3 dB/Octave (+0 /-5 %)
  • Annex C (normative): Procedures for measurement of radiated emissions
  • Annex D (normative): Procedures for measurement of conducted emissions
  • Annex E (informative): Explanation of nominated bandwidth
  • Annex F (normative): The TBR Requirements Table
  • Annex G (informative): Bibliography

1 Scope

This Technical Basis for Regulation (TBR) specifies those technical requirements under Article 4 of Council Directive 93/97/EEC (SES Directive), supplementing Council Directive 91/263/EEC (TTE Directive), in respect of satellite earth station equipment that apply to Mobile Earth Station (MES) equipment with both transmit and receive capabilities for operation in a Satellite - Personal Communications Network (S-PCN), in the Mobile Satellite Service (MSS) frequency bands given in table 1.

Table 1: Mobile Satellite Service (MSS) frequency bands MSS frequency bands MESs transmit 1 980 to 2 010 MHz MESs receive 2 170 to 2 200 MHz An S-PCN MES may be a handheld, portable, vehicle-mounted, host connected, semi-fixed or fixed equipment, or may be an element in a multi-mode terminal; it may consist of a number of modules with associated connections and user interface, or may be a self contained single unit. If the MES is an element in a multi-mode terminal, unless otherwise stated in this TBR, its requirements apply only to the S-PCN MES element of the terminal operating in the MSS frequency bands given in table 1.

The technical requirements in this TBR are applied under Articles 4.1 and 4.3 of the SES Directive referencing Article 4(e) of the TTE Directive, concerning effective use of the radio frequency spectrum, including the effective use of orbital resources and the avoidance of harmful interference between spacebased and terrestrial communications systems and other technical systems. These requirements are in two major categories:

unwanted emissions limits: to protect other radio services from harmful interference generated by the MES in normal use; MES Control and Monitoring Functions (CMF): to protect other radio services from unwanted transmissions from the MES. The CMF in each MES is capable of answering to commands from the Network Control Facilities (NCF) for its S-PCN.

NOTE: The requirements for Network Control Facilities (NCF) for S-PCN are contained in ETS 300 735 (see annex G).

There are no technical requirements in this TBR under:

  • Articles 4.1 and 4.4 of the SES Directive, referencing Article 4(c) of the TTE Directive as there are no EMC requirements specific to the S-PCN MESs, nor under:
  • Article 4.1 of the SES Directive, referencing Article 4(d) of the TTE Directive;
  • Articles 4.1 and 4.5 of the SES Directive, referencing Article 4(f) of the TTE Directive;
  • Articles 4.1 and 4.6 of the SES Directive, referencing Article 4(g) of the TTE Directive; as, for the purposes of the SES Directive and the TTE Directive, the radio interface between the MES and the S-PCN network is not regarded as a network termination point of a public telecommunications network.

An MES may be subject to additional or alternative requirements in other TBRs depending on its functionality, in particular if it supports a service which is considered a justified case for regulation of terminal equipment interworking via the public telecommunications network.

SIST TBR 042:1999 Page 10 TBR 42: February 1998

2 Normative references

This TBR incorporates, by dated or undated reference, provisions from other publications. These normative references are cited at the appropriate places in the text and the publications are listed hereafter. For dated references, subsequent amendments to, or revisions of any of these publications apply to this TBR only when incorporated in it by amendment or revision. For undated references the latest edition of the publication referred to applies.

[1] CCITT Recommendation O.153 (1988): "Characteristics of distortion and errorrate measuring apparatus for data transmission".

3 Definitions and abbreviations

3.1 Definitions

For the purposes of this TBR, the following definitions apply:

applicant: A party seeking an approval, or to place an S-PCN MES on the European market, i.e. the manufacturer of the equipment, or his authorized representative, or an equipment supplier to the European market.

carrier-on state (allocated a channel): An MES is in this state when it is transmitting a signal in a continuous or non-continuous mode.

carrier-off state (idle mode): An MES is in this state when it is powered-on but not transmitting a signal, i.e. not in carrier-on state.

conducted measurement: A measurement of emissions from an antenna port of the MES made by direct wired connection to the port.

Equivalent Isotropically Radiated Power (EIRP): The product of transmitter power and maximum antenna gain, equivalent to an isotropic source radiating uniformly in all directions. handheld: Indicates a PE MES which is self-contained and is small enough and light enough to be carried and used during a call with one hand.

host-connected: Indicates an MES for which connection to or integration with host equipment is necessary to offer functionality.

host equipment: Is any equipment which has a complete user functionality when not connected to the MES, and to which the MES provides additional functionality, and to which connection is necessary for the MES to offer functionality.

Installable Equipment (IE), Internally Mounted Equipment (IME) and Externally Mounted Equipment (EME): An Installable Equipment (IE) is an equipment which is intended to be installed in a vehicle. An IE may consist of one or several interconnected modules. The IE is composed of modules intended to be externally mounted as declared by the applicant, and defined as Externally Mounted Equipment (EME) and the remaining modules(s) as Internally Mounted Equipment (IME). Laboratory Test Equipment (LTE): A logical grouping that contains the standard test equipment provided by a test laboratory.

MSS band: A continuous range of frequencies allocated by the ITU to the MSS. multi-mode: Indicates equipment that accommodates radio stations of different radio networks. narrow-band system: A narrow band system is one in which the nominal carrier frequency spacing for MESs in the earth-to-space direction is less than 300 kHz.

network control channel: A channel by which an MES receives general control information from the NCF of its S-PCN.

SIST TBR 042:1999 Page 11 TBR 42: February 1998 NCF control message: A message, normally originating from a network, to a specified terminal or set of terminals of the network which indicates to the terminal or set of terminals that it/they should carry out some specific action or should enter or maintain some specific state. For test purposes NCF control messages may originate from Special Test Equipment (STE).

nominated bandwidth (B ): The B of the Mobile Earth Station (MES) radio frequency transmission is n n wide enough to encompass all spectral elements of the transmission which have a level greater than the specified levels of unwanted emissions. The B is defined relative to the MES actual carrier frequency f . n c B is the width of the frequency interval (f -a, f +b), where a and b, which shall be specified by the n c c applicant, may vary with f .

The frequency interval (f -a, f +b) shall not encompass more than either:

c c i) when a = b, 4 nominal carrier frequencies for narrow-band systems; ii) when a „ b, 1 nominal carrier frequency for narrow-band systems, or iii) 1 nominal carrier frequency for wide-band systems.

The frequency interval (f -a, f +b) shall be within the operational band of the MES. c c operational band: The sub-portion of the band 1 980 to 2 010 MHz which has been assigned in the earth-to-space direction to the MSS network, within which the MES is operating. Portable Equipment (PE): A Portable Equipment (PE) is generally intended to be self-contained, free standing and portable. A PE would normally consist of a single module, but may consist of several interconnected modules.

radiated measurement: A measurement of an actual radiated field. Special Test Equipment (STE): An equipment which allows a test laboratory to control the MES so that the tests required by this TBR can be performed.

test laboratory: A laboratory authorized by an accreditation body, which performs conformance testing in accordance with the SES and TTE directives.

test load: The test load is a substantially non-reactive, non-radiating power attenuator which is capable of safely dissipating the power from the transmitter(s).

unwanted emissions: Unwanted emissions are those falling outside the nominated bandwidth in the carrier-on state and those generated in the carrier-off state. wide-band system: A wide-band system is one in which the nominal carrier frequency spacing for MESs in the earth-to-space direction is equal or greater than 300 kHz.

3.2 Abbreviations

For the purposes of this TBR, the following abbreviations apply:

B nominated Bandwidth n CCITT Comité Consultatif International Télégraphique et Téléphonique (now ITU-T) CDMA Code Division Multiple Access CMF Control and Monitoring Functions dBW deciBels relative to 1 Watt EIRP Equivalent Isotropically Radiated Power EMC Electro-Magnetic Compatibility EME Externally Mounted Equipment IE Installable Equipment IEC International Electrotechnical Commission/Committee IME Internally Mounted Equipment ITU International Telecommunications Union LTE Laboratory Test Equipment MES Mobile Earth Station

SIST TBR 042:1999 Page 12 TBR 42: February 1998 MSS Mobile Satellite Service MIC MES unique Identification Code (within its S-PCN) NCF Network Control Facility PE Portable Equipment RF Radio Frequency SES Satellite Earth Stations and Systems or, in the case of the SES Directive, Satellite Earth Station S-PCN Satellite Personal Communications Network STE Special Test Equipment TDMA Time Division Multiple Access TTE Telecommunications Terminal Equipment

4 General

4.1 Presentation of equipment for testing purposes

The applicant may provide to a test laboratory one or more preliminary or production models of the MES equipment, as appropriate, for testing for conformance against the technical requirements of this TBR. If the MES is intended for use with an active antenna, this shall be provided as part of the MES. If a statement of conformance with the TBR is given by the test laboratory on the basis of tests on a preliminary model, then the statement of conformance shall apply to corresponding production models only if they are identical in all technical respects with the preliminary model tested.

4.2 Description of equipment

The applicant shall provide to the test laboratory a statement which contains all of the information related to the MES and its testing environment which will enable the test laboratory to run an appropriate test suite against the MES.

This shall include:

  • Self contained or host-connected;
  • Single-mode or multi-mode;
  • Antenna:
  • active; or
  • passive, with an antenna port available; or
  • passive, no antenna port available.

NOTE 1: If the MES has an active antenna, the antenna is regarded as an integral part of the MES.

NOTE 2: If the MES is intended for use with a passive antenna, the maximum gain of any antenna intended to be used with the equipment is to be stated. - The method by which the equipment can be switched into its test modes. NOTE 3: If Special Test Equipment (STE) is required see annex A, clause A.2. - The fault conditions which cause transmission shut-down; - The nominal, the lower extreme and the higher extreme operational voltages; - In the case of a multi-mode MES, the other modes of operation; - If the conducted emission measurements are to be performed:

  • The gain at the frequency of the measured spurious emission, according to the choice of the applicant.

SIST TBR 042:1999 Page 13 TBR 42: February 1998 - In an information leaflet, for each S-PCN for which the MES is designed to operate:

1) the name of the S-PCN; 2) the maximum value of nominated bandwidth for that S-PCN, as defined by the network operator; 3) the a and b values of the nominated bandwidth for each nominal carrier frequency of the MES; 4) the operating frequency range(s) of the MES; 5) The frequency sub-bands and operating conditions for which the different EIRP density limits apply; 6) the maximum gross data rate at which the MES is designed to operate 7) the agreement of the network operator to the above information;

4.3 Host-connected equipment

For testing of equipment for which connection to, or integration with, host equipment is required to offer functionality, the applicant shall supply a statement indicating which of the test configurations detailed in clause B.4 shall be used.

5 Unwanted emissions outside the band 1 980,1 to 2 009,9 MHz (carrier-on)

5.1 Justification

This requirement is justified under SES Directive Articles 4.1 and 4.3.

5.2 Purpose

Protection of other radio services operating outside the band 1 980 to 2 010 MHz from emissions caused by S-PCN MESs operating within the band 1 980,1 to 2 009,9 MHz.

5.3 Conformance requirements

The maximum EIRP density of the unwanted emissions from the MES outside the band 1 980,1 to 2 009,9 MHz shall not exceed the limits in table 2.

In table 2, whenever a change of limit between adjacent frequency bands occurs, the lower of the two limits shall apply at the transition frequency.

SIST TBR 042:1999 Page 14 TBR 42: February 1998 Table 2: Unwanted emissions outside the band 1 980,1 to 2 009,9 MHz Frequency Carrier - on (MHz) EIRP (dBW) Measurement bandwidth Measurement method 0,1 - 30 -66 10 kHz Peak hold 30 - 1 000 -66 100 kHz Peak hold 1 000 - 1 559 -60 3 MHz Average 1 559 - 1 626,5 -70 1 MHz Average (over 20 ms) 1 626,5 - 1 950 -60 3 MHz Average 1 950 - 1 960 -60 1 MHz Average 1 960 - 1 970 -60 300 kHz Average 1 970 - 1 975 -60 100 kHz Average 1 975 - 1 978,1 -60 30 kHz Average 1 978,1 - 1 980,1 The levels in table 3 for the frequency offset 0 to 2 MHz shall apply from 1 980,1 to 1 978,1 MHz 1 980,1 - 2 009,9 Not applicable Not applicable Not applicable 2 009,9 - 2 011,9 The levels in table 3 for the frequency offset 0 to 2 MHz shall apply from 2 009,9 to 2 011,9 MHz 2 011,9 - 2 015 -60 30 kHz Average 2 015 - 2 020 -60 100 kHz Average 2 020 - 2 030 -60 300 kHz Average 2 030 - 2 040 -60 1 MHz Average 2 040 - 2 600 -60 3 MHz Average 2 600 - 12 750 -60 3 MHz Peak hold The conformance requirements apply for the full range of environmental conditions corresponding to the type of equipment as specified in clause B.2.

5.4 Method of test

This test shall be carried out for the minimum and for the maximum MES transmit frequencies for which the MES is designed to operate, as specified by the applicant. The environmental test conditions are given in clause B.3.

For each test, the MES shall be set to transmit (carrier-on) on one of the specified transmitting frequencies to be tested at its maximum power for that transmit frequency, by means of the STE or by another test facility provided by the applicant.

If there is a handover function in the MES (to allow change of frequency channel during a call), this function shall be disabled.

The transmitted carrier shall be modulated by a test signal at maximum rate as specified in subclause A.2.3.

In the test equipment, the spectrum analyzer noise floor shall be at least 6 dB below the appropriate limits given in table 2.

The measurements are performed with the radiated or with the conducted method according to the cases defined in clause A.4.

For measurements of radiated unwanted emissions, annex C applies. For measurements of conducted unwanted emissions, annex D applies.

SIST TBR 042:1999 Page 15 TBR 42: February 1998

5.4.1 Peak measurement

In the case of peak measurement, the spectrum analyzer shall be set in sweep mode and shall be operated under the following conditions:

frequency sweep: as required for frequency range to be assessed; resolution bandwidth: measurement bandwidth specified in table 2; display bandwidth: at least three times the measurement bandwidth; averaging: no; peak hold: yes.

The sweep time shall be the shortest possible time consistent with proper calibration and ease of operation.

The spectrum analyzer shall be stepped over the frequency ranges specified in table 2 for peak measurement.

5.4.2 Average measurement

In the case of average measurement, the spectrum analyzer shall be set in sweep mode and shall be operated under the following conditions:

frequency sweep: as required for frequency range to be assessed; resolution bandwidth: measurement bandwidth specified in table 2; display bandwidth: equal to the measurement bandwidth; averaging: yes; peak hold: no.

The measurement time shall be such that the difference of the measured levels, averaged over subsequent measurement samples, is less than 1 dB, or a measurement time of 100 ms may be used if the measured values comply with the applicable limits.

For a MES operating in a non-continuous carrier mode, the measurement shall be performed over the active part of the transmitted bursts. The total sample time used for measurement shall be not less than 40 % of the duration of the active part of the transmitted burst. The measurement shall be made over the random part of the burst, excluding any preambles or synchronisation sequences. The spectrum analyzer shall be stepped over the frequency ranges specified in table 2 for average measurement.

5.5 Test requirements

For measurements of radiated unwanted emissions of the MES, the measured values shall in no case exceed the limits given in table 2.

For measurements of conducted unwanted emissions of the MES, the measured values plus the maximum antenna gain shall in no case exceed the limits given in table 2.

SIST TBR 042:1999 Page 16 TBR 42: February 1998

6 Unwanted emissions within the bands 1 980,1 to 2 009,9 MHz, 1 978,1 to

1 980,1 MHz and 2 009,9 to 2 011,9 MHz (carrier-on)

6.1 Justification

This requirement is justified under SES Directive Articles 4.1 and 4.3.

6.2 Purpose

Protection of radio services and systems operating within the frequency band 1 978,1 to 2 011,9 MHz from unwanted emissions caused by S-PCN MESs operating in the band 1 980,1 to 2 009,9 MHz.

6.3 Conformance requirements

The maximum EIRP spectral density of the unwanted emissions from the MES within the band 1 978,1 to 2 011,9 MHz shall not exceed the limits in tables 3 or 4, as applicable. In the tables 3 and 4, whenever a change of limit between adjacent frequency bands occurs, the lower of the two limits shall apply at the transition frequency.

When conflicts between multiple requirements exist, the more stringent requirement applies. Table 3: Maximum unwanted emissions within the bands 1 980,1 to 2 009,9 MHz from a TDMA carrier, and maximum unwanted emissions within the bands 1 978,1 to 1 980,1 and 2 009,9 to 2 011,9 MHz from any carrier Carrier - on Frequency offset (kHz) EIRP Measurement bandwidth Measurement (note 1) (dBW) (kHz) method 0 to 166 3 kHz Average 0 - (offset · 55/166) 166 to 575 -55 3 kHz Average 575 to 1 175 -60 3 kHz Average 1 175 to 1 525 30 kHz (note 2) Average -50 -((offset - 1 175) · 5/350) 1 525 to 32 000 -55 30 kHz (note 2) Average NOTE 1: Frequency offset is determined from edge of nominated bandwidth. NOTE 2: The measurement bandwidth used may be 3 kHz if the unwanted EIRP limits are reduced correspondingly.

Table 4: Maximum unwanted emissions within the band 1 980,1 to 2 009,9 MHz from a CDMA carrier Carrier - on Frequency offset (kHz) EIRP (dBW) Measurement bandwidth Measurement (note) (kHz) method 0 to 160 -35 30 Average 160 to 2 300 -35 - ((offset -160) x 21/ 2 140) 30 Average 2 300 to 32 000 -56 30 Average NOTE: Frequency offset is determined from the edge of nominated bandwidth. The conformance requirements apply for the full range of environmental conditions corresponding to the type of equipment as specified in clause B.2.

...