SIST ETS 300 233/A1 E1:2003
(Amendment)Integrated Services Digital Network (ISDN); Access digital section for ISDN primary rate; Conformance Testing Principles
- Abstract
Annex C to ETS 300 233.
- Status
- Published
- Publication Date
- 30-Nov-2003
- Current Stage
- 6060 - National Implementation/Publication (Adopted Project)
- Start Date
- 01-Dec-2003
- Due Date
- 01-Dec-2003
- Completion Date
- 01-Dec-2003
SIST ETS 300 233/A1 E1:2003 is the Slovenian adoption of ETS 300 233/A1 Edition 1 from ETSI. It adds Annex C to ETS 300 233 and defines conformance test principles for the ISDN primary rate access digital section, mainly for checking implementations at the T and V3 reference points. Manufacturers, test laboratories, and network engineers use it to verify frame handling, timing, defect reporting, loopback behavior, and power feeding.
What does SIST ETS 300 233/A1 E1:2003 specify?
SIST ETS 300 233/A1 E1:2003 specifies the test principles for Annex C of ETS 300 233. The annex is normative and is organized as general information, signal requirements, a state matrix, interface procedure tests, power feeding, defect detection, and loopback operations.
The annex focuses on how to test an implementation under test against the ETS at the T reference point and the V3 reference point. It also states what is outside its scope: safety, overvoltage protection, electromagnetic immunity, and emission limits.
In practice, this means the document is about conformance checking of the digital section itself, not about broader installation safety or EMC qualification. It also makes clear that a test setup does not have to follow one fixed equipment arrangement, as long as it creates the required system state, stimulus, and monitor conditions.
What are the key requirements of SIST ETS 300 233/A1 E1:2003?
Test setup and scope
SIST ETS 300 233/A1 E1:2003 requires conformance testing to be carried out against the relevant test points for the access digital section, especially T and V3. For electrical characteristics, the simulator is connected directly to the interface wiring points on the implementation under test unless the test says otherwise.
For other tests, the wiring must follow the interface requirements named in the annex. This matters because the same equipment may pass in one arrangement but fail if the timing, wiring, or stimulus does not match the defined test conditions.
Transparent transfer, coding, and frame structure
SIST ETS 300 233/A1 E1:2003 checks transparent transfer of the user channels and associated bits, including B-channel, H0-channel, H1-channel, M-channel, D-channel, A-bit, Sa7-bit, and Sa8-bit between T and V3. It also checks coding, decoding, frame organization, frame alignment, multiframe alignment, and CRC-related behavior.
In practice, the device has to pass the test patterns through without corrupting them and has to build the expected frame structure on the outgoing side. That is what proves the device is handling the primary rate stream correctly rather than simply carrying a signal.
Timing, delay, and jitter
SIST ETS 300 233/A1 E1:2003 includes tests for signal transfer delay, synchronisation, octet timing, and jitter at both reference points. These tests verify that the implementation can lock to the incoming timing, pass timing through correctly, and keep its output jitter within the relevant limits.
This matters for interoperability, because even if frames are correct, poor timing behavior can make the link unstable or cause downstream equipment to lose alignment. The annex therefore uses controlled timing variation and jitter input to see how the implementation reacts.
State matrix, alarms, and defect handling
SIST ETS 300 233/A1 E1:2003 requires testing of the implementation’s stable states and the transitions between them. The annex then checks detection and reporting of defect conditions such as loss of signal, loss of frame alignment, AIS, loss of power, and the simultaneous occurrence of more than one defect.
For the reader, this means the equipment must not only detect faults but also send the right coded indications toward the other side of the access digital section. That behavior is important for fault isolation, maintenance, and consistent network reactions.
CRC processing and frame alignment
SIST ETS 300 233/A1 E1:2003 includes dedicated tests for frame alignment, CRC multiframe alignment, and CRC processing. These tests use defined frame and multiframe patterns to confirm that the implementation recognizes alignment correctly and reports CRC errors in the expected way.
In practice, this shows whether the device can distinguish a clean frame from an errored one and whether it raises the right error information to the other side. That is central to dependable maintenance signaling.
Power feeding and loopback operations
SIST ETS 300 233/A1 E1:2003 also checks power feeding at the T reference point and the behavior of loopback 1 and loopback 2 procedures. The power test verifies consumption and correct operation when the feeding wires are interchanged, while the loopback tests verify activation, acknowledgement, and release behavior.
This matters because these are common installation and maintenance functions. If a device cannot power correctly or respond predictably to loopback control, it will be difficult to install, test, or troubleshoot in the field.
What terms does SIST ETS 300 233/A1 E1:2003 define?
- Primary rate access Digital Section (DS): The portion that carries a digital signal of specified rate between two consecutive reference points, qualified by the type of access or the V interface prefix.
- Item Under Test (IUT): The implementation being examined, covering the user side interface (T) and the exchange side interface (V3).
- Simulator: A device that generates the required stimulus signal and monitors the receive signal from the IUT during conformance testing.
- Frame Alignment Signal (FAS): The frame-related bit pattern used to establish frame alignment.
- Multiframe Alignment Signal (MFAS): The signal used to identify and align multiframes.
- Pseudo Random Bit Sequence (PRBS): A test pattern used to fill channels or bit positions during signal transfer and timing tests.
- Loss of signal (LOS): A defect condition used in the annex to test how the IUT detects missing or severely reduced incoming signal.
- Loss of frame alignment (LFA): The condition in which the implementation has lost correct frame alignment and must report or react accordingly.
Who uses SIST ETS 300 233/A1 E1:2003?
SIST ETS 300 233/A1 E1:2003 is used by telecom equipment manufacturers, conformance test laboratories, and engineering teams that develop or verify ISDN primary rate access equipment. It is especially relevant for checking NT1- and LT-related behavior at the T and V3 reference points.
Buyers and quality managers use it when they need a clear acceptance basis for equipment that must handle frame alignment, CRC reporting, jitter, alarms, and loopback control. Network and maintenance teams use it to understand how the access digital section should react to defect conditions in practice.
What changed in SIST ETS 300 233/A1 E1:2003 from the previous edition?
SIST ETS 300 233/A1 E1:2003 is Amendment A1 to ETS 300 233 (1994). The amendment adds Annex C and replaces the earlier placeholder text “To be provided” with the conformance test principles for the ISDN primary rate access digital section.
Which standards are used with SIST ETS 300 233/A1 E1:2003?
- ETS 300 011 - provides the T reference point and the jitter and wander conditions referenced in the annex.
- CCITT Recommendation G.703 - gives the interface characteristics used for V3 and the wiring and signal assumptions used in testing.
- CCITT Recommendation Q.512 - identifies V3 as a standard G.703 interface, either balanced or unbalanced.
- CCITT Recommendation G.704 - supports the frame, multiframe, and CRC error concepts used in the test sequences.
- CCITT Recommendation G.706 - supports the frame alignment behavior and alarm options used in the alignment tests.
- CCITT Recommendation G.823 - provides the jitter limits used for output jitter checks.
What does the SIST ETS 300 233/A1 E1:2003 document contain?
The annex contains detailed test configurations, stimulus definitions, monitor points, and expected results for each major behavior under test. It includes figures for transparent transfer, coding, frame alignment, delay, timing, jitter, defect detection, power feeding, and loopback operations.
It also contains tables that map requirements to the relevant clauses and test points, so a laboratory can see which parts apply to T, V3, or both. Separate sequence definitions are given for frame alignment, CRC multiframe alignment, CRC processing, defect conditions, and loopback commands.
The document uses named test patterns such as FRAME A-C, SMF A-D, and MF A-B to drive the state and alarm behavior of the implementation. That makes it a practical conformance test annex for laboratory verification and fault-insertion testing.
Get Certified
Connect with accredited certification bodies for this standard

ANCE
Mexican certification and testing association.

Intertek Slovenia
Intertek testing, inspection, and certification services in Slovenia.
LNE (Laboratoire National de Métrologie et d'Essais)
French national laboratory for metrology and testing.
Sponsored listings
Frequently Asked Questions
SIST ETS 300 233/A1 E1:2003 is a amendment published by the Slovenian Institute for Standardization (SIST). Its full title is "Integrated Services Digital Network (ISDN); Access digital section for ISDN primary rate; Conformance Testing Principles". This standard covers: Annex C to ETS 300 233.
Annex C to ETS 300 233.
SIST ETS 300 233/A1 E1:2003 is classified under the following ICS (International Classification for Standards) categories: 33.080 - Integrated Services Digital Network (ISDN). The ICS classification helps identify the subject area and facilitates finding related standards.
SIST ETS 300 233/A1 E1:2003 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
SLOVENSKI STANDARD
01-december-2003
Digitalno omrežje z integriranimi storitvami (ISDN) – Dostopovni digitalni oddelek
za primarne funkcije ISDN
Integrated Services Digital Network (ISDN); Access digital section for ISDN primary rate;
Conformance Testing Principles
Ta slovenski standard je istoveten z: ETS 300 233/A1 Edition 1
ICS:
33.080 Digitalno omrežje z Integrated Services Digital
integriranimi storitvami Network (ISDN)
(ISDN)
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
ETS 300 233
AMENDMENT A1
March 1995
Source: ETSI TC-TM Reference: RE/TM-03046
ICS: 33.080
ISDN, primary rate access digital section, testing
Key words:
This amendment A1 modifies
the European Telecommunication Standard ETS 300 233 (1994)
Integrated Services Digital Network (ISDN);
Access digital section for ISDN primary rate
ETSI
European Telecommunications Standards Institute
ETSI Secretariat
F-06921 Sophia Antipolis CEDEX - FRANCE
Postal address:
650 Route des Lucioles - Sophia Antipolis - Valbonne - FRANCE
Office address:
c=fr, a=atlas, p=etsi, s=secretariat - secretariat@etsi.fr
X.400: Internet:
Tel.: +33 92 94 42 00 - Fax: +33 93 65 47 16
Copyright Notification: No part may be reproduced except as authorized by written permission. The copyright and the
foregoing restriction extend to reproduction in all media.
© European Telecommunications Standards Institute 1995. All rights reserved.
New presentation - see History box
Page 2
ETS 300 233: May 1994/A1 March 1995
Whilst every care has been taken in the preparation and publication of this document, errors in content,
typographical or otherwise, may occur. If you have comments concerning its accuracy, please write to
"ETSI Editing and Committee Support Dept." at the address shown on the title page.
Page 3
ETS 300 233: May 1994/A1 March 1995
Foreword
This amendment to ETS 300 233 (1994) has been produced by the Transmission and Multiplexing (TM)
Technical Committee of the European Telecommunications Standards Institute (ETSI).
This amendment provides the annex C, which was left "To be provided" in ETS 300 233 (1994).
Amendment
Page 74, annex C
Replace the current annex C "To be provided" with the following annex C.
Annex C (normative): Conformance test principles for the ISDN primary rate
access digital section
C.1 Scope and general information
C.1.1 Scope of this annex
This annex provides the test principles for the requirements of this ETS used to determine the compliance
of an implementation under test to this ETS.
This annex does not specify test related to:
- safety requirements;
- interface or equipment overvoltage protection requirements;
- immunity requirements against electromagnetic interferences;
- emission limitation requirements.
Detailed test equipment accuracy and the specification tolerance of the test devices is not a subject of this
annex. Where such details are provided then those test details are considered as being an informative
addition to the test description.
The test configurations given do not imply a specific realisation of test equipment, or arrangement, or the
use of specific test devices for conformance testing. However, any test configuration used shall provide
those test conditions specified under "system state", "stimulus" and "monitor" for each individual test.
C.1.2 General information
For conformance test of the access digital section two relevant test points have to be identified:
- the T reference point covered by ETS 300 011 [1];
- the V3 reference point.
This annex is applicable to interfaces T and V3 as appropriate. The field of application is given at the
beginning of each test.
As the transmission system is not specified in this ETS, only relevant signals inside the primary rate
stream need to be checked. The coding and the frame organization of this bit stream is outside the scope
of this ETS.
Page 4
ETS 300 233: May 1994/A1 March 1995
C.1.2.1 Additional information to support the test
The V3 interface is required to be a standard CCITT Recommendation G.703 [8] interface (either 120 Ω
balanced or 75 Ω unbalanced) according to CCITT Recommendation Q.512 [4].
If the V3 reference point is not implemented as an interface, a suitable means such as either a local
exchange or a Conformance Test Adaptor (CTA) enabling the monitoring of the V1 reference point and
giving access to the B and D channels shall be provided by the manufacturer.
C.1.2.2 Abbreviations
For the purpose of this annex the following additional abbreviations apply:
FAS Frame Alignment Signal
IUT Item Under Test
MF Multiframe
MFAS Multiframe Alignment Signal
PRBS Pseudo Random Bit Sequence
Rx interface signal Receiver (of the IUT or simulator)
SMF Sub-Multiframe
Tx interface signal Transmitter of the IUT or simulator
C.1.2.3 Definitions
For the purpose of this annex the following additional definitions apply:
Primary rate access Digital Section (DS): the provision to transmit a digital signal of specified rate
between two consecutive reference points. The term should be qualified by the type of access supported,
or by a prefix denoting the V interface at the digital section boundaries. For example:
- basic rate access digital section;
- primary rate access digital section;
-V digital section.
Item Under Test (IUT): Implementation of interfaces related functions for:
- the user side interface (T), i.e. NT1; and
- the exchange side interface (V
), i.e. LT.
Simulator (terminal equipment, exchange): device generating a stimulus signal conforming to this ETS
to bring the IUT into the required operational state and monitoring the receive signal from the IUT. It can
either be a simulator for the user side or the exchange side of the interface.
C.1.3 Connection of the simulator to the IUT
For testing the electrical characteristics of the IUT, the simulator, or its relevant part, shall be connected
directly to the interconnecting points for the interface wiring at the IUT unless otherwise stated.
All other tests may be performed with interface wiring complying with the requirements given in CCITT
Recommendation G.703 [8] and in ETS 300 011 [1], table 1, clause 7.
Page 5
ETS 300 233: May 1994/A1 March 1995
C.1.4 Allocation of test
One test definition may cover more than one requirement for one or both interface points (interface T or
V3). Requirements which do not need specific test definition are indicated by "N/R" (Not Relevant).
Requirements which are not relevant for this ETS and which require testing defined by other ETSs are
indicated by "N/A" (Not Applicable).
C.1.4.1 General
Table C.1: General requirements
Functions Clause/ Relevant interface Test defined in
subclause T, V3, or T and V3
Scope 1 N/R
Normative references 2 N/R
Definitions and abbreviations 3 N/R
Definitions 3.1 N/R
Abbreviations 3.2 N/R
C.1.4.2 Type of configuration and applications requirements
Table C.2: Type of configuration and applications requirements
Functions Clause/ Relevant interface Test defined in
subclause T, V3, or T and V3
Configuration and application 4 N/R
Configuration 4.1 N/R
Application 4.2 N/R
Modelling and relationship between 4.3 N/R
the access DS and the ET
Page 6
ETS 300 233: May 1994/A1 March 1995
C.1.4.3 Functional characteristics requirements
Table C.3: Functional characteristics requirements
Functions Clause/ Relevant interface Test defined in
subclause T, V3, or T and V3
Function 5 N/R
B-channel 5.1 T and V3 C.2.1 and C.2.5.5
H0-channel 5.2 T and V3 C.2.1 and C.2.5.5
H1-channel 5.3 T and V3 C.2.1 and C.2.5.5
D-channel 5.4 T and V3 C.2.1
Bit timing 5.5 T and V3 C.2.5
Octet timing 5.6 T and V3 C.2.3, C.2.3.3, and
C.2.5.5
Frame alignment 5.7 T and V3 C.4.1
CRC-4 procedure 5.8 T and V3 C.4.2
M channel 5.9 T and V3 C.2.1
Power feeding 5.10 T C.5.1
Operation and maintenance of access 5.11 T and V3 C.3.1
digital section
Page 7
ETS 300 233: May 1994/A1 March 1995
C.1.4.4 Signal delay and jitter requirements
Table C.4: Signal delay and jitter requirements
Functions Clause/ Relevant interface Test defined in
subclause T, V3, or T and V3
Signal transfer delay 6 T and V3 C.2.4
Jitter 7 N/R
Output/Input jitter at T reference point 7.1 T C.2.6.1 and C.2.6.3
Jitter at V3 reference point 7.2 V3 C.2.6.2
C.1.4.5 Operation and maintenance
Table C.5: Operation and maintenance requirements
Functions Clause/ Relevant interface Test defined in
subclause T, V3, or T and V3
Operation and maintenance 8 N/R
Control facilities 8.1 N/R
Loopbacks 8.1.1 N/R
Loopbacks implementation 8.1.1.1
i) V3 C.7.1
ii) V3 C.7.2
Loopback procedure 8.1.1.2 C.7
Monitoring 8.2 N/R
Functions 8.2.1 N/R
Defect conditions and consequent 8.2.2 N/R
action
Detection of defect conditions 8.2.2.1 N/R
(continued)
Page 8
ETS 300 233: May 1994/A1 March 1995
Table C.5 (continued): Operation and maintenance requirements
Functions Clause/ Relevant interface Test defined in
subclause T, V3, or T and V3
Definition of defect indication signals 8.2.2.2
- NF T and V3 C.2.2
- Frames T and V3 C.6
- Substituted frames V3 C.3.1 and C.6.4
- LFA T and V3 C.3.1
- Loss of power in NT1 or LT T and V3 C.3.1 and C.6.6
- AUXP T and V3 C.6.8
Detection of defect indication signals 8.2.2.3
- LOS or LFA at line side of NT1 V3 C.8.3
- LOS at line side of LT V3 C.8.8
- Loss of power at NT1 V3 C.8.6
- AIS at line side of NT1 V3 C.2.5.1
- LOS at V3 V3 C.6.3
- LOS at T T and V3 C.6.2
- Loss of power at T T and V3 C.3.1
Definition of detection algorithm 8.2.2.4
- NOF T and V3 C.2.1
- LFA T and V3 C.4.3
- Loss of signal at T and V3 T and V3 C.3.1 and C.6.1
- AIS T and V3 C.3.1
- Loss of power in the NT1 T and V3 C.3.1 and C.6.6
- Loss of power in the LT T and V3 C.3.1
Consequent action 8.2.2.5 T and V3 C.6
Error performance monitoring 8.3 V3 C.4.2 and C.4.3
Operation and maintenance 9 N/R
procedures
Partitioning of function 9.1 N/R
Definitions of signals at T reference 9.2 N/R
point
Definitions of signals at V3 reference 9.3 N/R
point
(continued)
Page 9
ETS 300 233: May 1994/A1 March 1995
Table C.5 (continued): Operation and maintenance requirements
Functions Clause/ Relevant interface Test defined in
subclause T, V3, or T and V3
FEs related to operation and table 2
maintenance
- normal DS->ET V3 C.2.2 and C.6
- normal DS<-ET N/A
- unintentional loopback V3 C.3.1 and C.6
- LOS/LFA at TE (FC2) T and V3 C.3.1, C.4.1, and
C.6.2
- LOS at line side of NT1 or at T and V3 C.3.1 and C.6.3
V3 (FC3)
- LOS/LFA at V3 of ET (FCL) N/A
- LOS/LFA at T (FC4) T and V3 C.3.1 and C.6.4
- FC3 and FC4 simultaneously T and V3 C.3.1 and C.6.5
- Loss of power at NT1 T and V3 C.3.1 and C.6.6
- Loss of power at NT1 and T and V3 C.6.7 and C.6.2
LOS/LFA at TE simultaneously
- LOS at line side of LT V3 C.6.8 and C.3.1
- Reception of AIS at V3 of LT V3 C.3.1 and C.2.5.1
(reaction to FCDL or FCET)
- Reception of AIS at V3 of LT V3 C.2.5.1
and FC4 simultaneously
- Defect FCET in ET or FCDL N/A
between V3 and V3'
- Defect FCDLu between V3 N/A
and V3'
FEs related to loopback operation table 3
- loopback 1 command V3 C.7
- loopback 2 command V3 C.7
- loopback acknowledge V3 C.7
- loopback release command V3 C.7
(continued)
Page 10
ETS 300 233: May 1994/A1 March 1995
Table C.5 (concluded): Operation and maintenance requirements
Functions Clause/ Relevant interface Test defined in
subclause T, V3, or T and V3
FEs related to CRC-4 error detection table 4
- CRC error report from NT1 V3 C.4.3
- CRC error information from V3 C.4.3
ET
- CRC error report from TE V3 C.4.3
- CRC error detection at T of V3 C.4.3
NT1
- Simultaneously occurrence of V3 C.4.3
FE W and FE X
Definition of ET layer 1 state machine 9.5 N/R
DS states 9.5.1 N/R
DS states trans. table 9.5.2 N/R
Assumptions 9.5.2.1 N/R
Classification of DS states 9.5.2.2 N/R
Definition of notations 9.5.2.3 N/R
Notes to DS state table 9.5.2.4 N/R
Page 11
ETS 300 233: May 1994/A1 March 1995
C.1.4.6 System management requirements
Table C.6: System management requirements
Functions Clause/ Relevant interface Test defined in
subclause T, V3, or T and V3
Introduction A.1 N/A
System management requirements A.2 N/A
General A.2.1 N/A
Error indications A.2.2 N/A
Loopback operations A.2.3 N/A
Information to be sent in the D A.2.4 N/A
channel during loopback operation
Configuration control A.2.5 N/A
Handling of CRC error information in A.3 N/A
the ET
Definition of ET layer 1 state machine A.4 N/A
ET layer 1 states A.4.1 N/A
PH and MPH primitives A.4.2 N/A
The repertoire of PH and MPH A.4.2.1 N/A
primitives
ET layer 1 state transition table A.4.3 N/A
Definition of notations A.4.3.1 N/A
Classification of ET states A.4.3.2 N/A
Page 12
ETS 300 233: May 1994/A1 March 1995
C.2 Signal requirements
C.2.1 Access digital section transparent signal transfer
Test applicable at T and V3 reference points.
Purpose: To check the access digital section's transparent transfer of B-channel,
H0-channel, H1-channel, M-channel, D-channel, A-bit, Sa7-bit and Sa8-bit
between T and V3 reference points.
Test configuration:
T V3
TX
RX TX RX
SIMULATOR
SIMULATOR
T IUT V3
REF.POINT REF.POINT
TX RX
RX TX
POW ER
POW ER
SOURCE SINK
T V3
Figure C.1: Test configuration for access digital section transparent signal transfer
System state: State DS 1.11 (normal operation).
Stimulus: A PRBS is used to fill appropriate channels or bits under test.
Monitor: The IUT output signal at both T and V3 reference point.
Results: The monitored output signal has to match the stimulus signal.
Page 13
ETS 300 233: May 1994/A1 March 1995
C.2.2 HDB3 coding and normal operational frame
Test applicable at T and V3 reference points.
Purpose: To check the coding, decoding, and the binary organization of normal
operational frame.
Test configuration:
T V3
TX RX TX RX
SIMULATOR
SIMULATOR
T IUT V3
REF.POINT REF.POINT
RX TX RX TX
POW ER
POW ER
SOURCE
SINK
T V3
Figure C.2: Test configuration for HDB3 coding and normal operational frame
System state: State DS 1.11 (normal operation):
- network timing and layer 1 services are available;
- the network side transmits and receives operational frames with
associated CRC bits and temporary CRC error information;
- the network side checks the received frames and the associated CRC
bits, and transmits to the user side operational frames containing the
CRC error information, if a CRC error is detected.
Stimulus: Normal operational frame sent continuously from the Simulators with valid time
slot 0 including active CRC and without CRC error. A PRBS 2 - 1 shall fill
continuously all the frame except time slot 0 (net bit rate 1 984 kbit/s).
Monitor: The coding and the frame structure of the signal sent from the IUT.
Results: The signal received shall be encoded according to the HDB3 coding rule
(annex A of CCITT Recommendation G.703 [8]). The frame shall comprise valid
time slot 0 with A bit set to ZERO, E bit set to ONE and including correct CRC
without CRC blocks in error.
Page 14
ETS 300 233: May 1994/A1 March 1995
C.2.3 Frame structure
These tests check the frame composition.
C.2.3.1 Number of bits per time slot
This requirement cannot be verified via layer 1 procedures.
Test to be performed at higher protocol layers.
C.2.3.2 Number of time slots per frame
This requirement cannot be verified via layer 1 procedures.
Test to be performed at higher protocol layers.
C.2.3.3 Generation of frame alignment word
Test applicable at T and V3 reference point.
Purpose: To check the correct generation of frame alignment word, Multiframe (MF)
alignment word, CRC bits C1 to C4.
Test configuration:
T V3
TX
RX TX RX
SIMULATOR
SIMULATOR
T IUT V3
REF.POINT REF.POINT
RX
RX TX TX
POW ER POW ER
SOURCE SINK
T V3
Figure C.3: Test configuration for generation of frame alignment word
System state: State DS 1.11 (normal operation).
Stimulus: Normal operational frames with PRBS 2 - 1 in time slot 1 to 31.
A PRBS 2 - 1 shall fill continuously all the frame except time slot 0 (net bit rate
1 984 kbit/s).
Monitor: Correct frame alignment word, MF alignment word, CRC bits.
Results: No detection of incorrect frame alignment word, MF alignment word, and no
received Sub-Multiframes (SMFs) in error within 1 s measured in any state.
During this test the E bit is not considered.
Page 15
ETS 300 233: May 1994/A1 March 1995
C.2.4 Signal transfer delay
Test applicable at T and V3 reference points.
Purpose: To test the mean one way delay between T and V3 interfaces in the two
directions of transmission.
Test configuration:
T V3
TX RX TX RX
SIMULATOR
SIMULATOR
T IUT V3
REF.POINT REF.POINT
RX TX RX TX
POW ER
POW ER
SOURCE
SINK
T V3
Figure C.4: Test configuration for signal transfer delay
System state: State DS 1.11 (normal operation):
- network timing and layer 1 services are available.
Stimulus: An appropriate sequence sent in the B channels.
Monitor: Measure the delay to receive this sequence in the B channels at the reception
side.
Results: Mean value < 1 250 μs.
Page 16
ETS 300 233: May 1994/A1 March 1995
C.2.5 Timing considerations
C.2.5.1 AIS recognition
Test applicable at V3 reference point.
Purpose: To check the ability of the IUT to recognize AIS.
Test configuration:
T V3
TX RX TX RX
SIMULATOR
SIMULATOR
T
IUT V3
REF.POINT REF.POINT
TX RX
RX TX
POW ER
POW ER
SOURCE SINK
T V3
Figure C.5: Test configuration for timing considerations, AIS recognition
System state: State DS 6.66
Stimulus: AIS signal at V3 reference point with nominal clock frequency 2 048 kbit/s,
nominal clock frequency + 50 ppm, nominal clock frequency - 50 ppm.
The user side transmits, through the DS, to the network side operational frames
with associated CRC bits and RAI.
Monitor: The frames transmitted by the IUT.
Results: The IUT shall remain in state DS 6.66, therefore no change of error indication
shall occur.
AIS shall be detected at T reference point, FE M and associated CRC bits at V3
reference point.
Page 17
ETS 300 233: May 1994/A1 March 1995
C.2.5.2 AIS generation
Test applicable at T reference point.
Purpose: To check the frequency of the AIS signal generated by the IUT.
Test configuration:
T V3
TX
RX TX RX
SIMULATOR
SIMULATOR
T IUT V3
REF.POINT REF.POINT
TX RX
RX TX
POW ER
POW ER
SOURCE SINK
T V3
Figure C.6: Test configuration for timing considerations, AIS generation
System state: State DS 4.32.
Stimulus: LOS of signal at V3 reference point (FV 3).
Monitor: The frequency of the signal generated by the IUT at the T reference point.
Results: The frequency has to be in the range 2 048 kbit/s ± 50 ppm.
Page 18
ETS 300 233: May 1994/A1 March 1995
C.2.5.3 Synchronisation at V3 reference point
Test applicable at V3 reference point.
Purpose: The ability of the IUT to synchronize its timing on the signal received from the
network and its ability to transfer this timing at T reference point.
Test configuration:
T V3
TX RX TX RX
SIMULATOR
SIMULATOR
T IUT V3
REF.POINT REF.POINT
RX TX RX TX
POW ER
POW ER
SOURCE
SINK
T V3
Figure C.7: Test configuration for timing considerations, synchronisation at V3 reference point
System state: State DS 1.11 (normal operation):
- network timing and layer 1 services are available.
Stimulus: Normal operational frames with clock frequency variation from the nominal value
in the range 2 048 kbit/s ± 5 ppm.
A PRBS 2 - 1 shall fill continuously all the frame except time slot 0 (net bit rate
1 984 kbit/s).
Monitor: The frames transmitted by the IUT.
Results: 1) the IUT shall remain in state DS 1.11, no LFA/LOS shall be detected
at T and V3 reference point;
2) the frequency of the outgoing signal at each access has to follow
the frequency of the stimulating input signal.
Page 19
ETS 300 233: May 1994/A1 March 1995
C.2.5.4 Synchronisation at T interface
Purpose: The ability of the IUT to synchronise to a frame signal at the T interface during
FC 2.
Test configuration:
T V3
TX
RX TX RX
SIMULATOR
SIMULATOR
T IUT V3
REF.POINT REF.POINT
TX RX
RX TX
POW ER
POW ER
SOURCE SINK
T V3
Figure C.8: Test configuration for timing considerations, synchronisation at T interface
System state: State DS 1.11 with FC 2:
- network timing at network side and layer 1 services are available.
Stimulus: NF at V3 reference point with nominal clock frequency.
NF at T reference point with A = 1 and clock frequency variation from the
nominal value of 2 048 kbit/s + 50 ppm and 2 048 kbit/s - 50 ppm.
A PRBS 2 - 1 shall fill continuously all the frame except time slot 0 (net bit rate
1 984 kbit/s).
Monitor: A bit, Sa5 bit and Sa6 bit at V3 reference point.
Results: Verify that A = 1, Sa5 = 1 and Sa6 = 00xx (x representing any value ONE or
ZERO).
Page 20
ETS 300 233: May 1994/A1 March 1995
C.2.5.5 Octet Timing and B channels octet transparency
Test applicable at T and V3 reference points.
Purpose: To check the access digital section's transparent transfer of B-channel octets
between T and V3 reference points.
Test configuration:
T V3
TX RX TX RX
SIMULATOR
SIMULATOR
T IUT V3
REF.POINT REF.POINT
RX TX RX TX
POW ER
POW ER
SOURCE
SINK
T V3
Figure C.9: Test configuration for timing considerations, octet timing and B channels octet
transparency
System state: State DS 1.11 (normal operation).
Stimulus 1: Alternatively a fixed word is inserted in a selected B channel chosen in the range
from B to B and B to B . The stimulus is applied at the T reference point.
1 15 17 31
Stimulus 2: Alternatively a fixed word is inserted in a selected B channel chosen in the range
from B to B and B to B . The stimulus is applied at the V3 reference point.
1 15 17 31
Monitor 1: The words in the selected B channel at the V3 reference point.
Monitor 2: The words in the selected B channel at the T reference point.
Results: No bit errors.
Page 21
ETS 300 233: May 1994/A1 March 1995
C.2.6 Jitter
C.2.6.1 Minimum tolerance to jitter and wander at inputs
Test applicable at T reference point.
Purpose: To check the ability of the IUT to tolerate on the 2 048 kbit/s incoming signal a
sinusoidal jitter/wander in accordance with ETS 300 011 [1], table 1,
subclause 5.4.2.
Test configuration:
T V3
JITTER
TX RX TX RX
MODULATOR
SIMULA TOR
SIMULATOR
T
IU T V3
RE F.POINT REF.POINT
RX TX RX
TX
POW ER
POW ER
SOURCE
SINK
T V3
Figure C.10: Test configuration for minimum tolerance to jitter and wander at inputs
System state: State DS 1.11 (normal operation):
- network timing and layer 1 services are available;
- the network side transmits and receives operational frames with
associated CRC bits and temporary CRC error information;
- the network side checks the received frames and the associated CRC
bits, and transmits to the user side operational frames containing the
CRC error information, if a CRC error is detected.
Stimulus: Normal operational frames with jitter/wander according to the table C.7
(reference: ETS 300 011 [1], table 1, subclause 5.4.2) and with a PRBS 2 - 1
in time slots 1 to 31. The PRBS 2 - 1 shall fill continuously all the frame except
time slot 0 (net bit rate 1 984 kbit/s).
Table C.7
A0 A1 A2 f0 f1 f2 f3 f4
-6
20,5 UI p-p 1,0 UI p-p 0,2 UI p-p 12x10 Hz 20 Hz 3,6 Hz 18 kHz 100 kHz
This test shall be performed twice with clock frequency varying from the nominal value + 5 ppm and
- 5 ppm.
Points A1 - f2 and A2 - f4 shall be measured. For the range between A0 - f0 to A1 - f1 the jitter behaviour
can be determined from the Q factor.
Monitor: The frames transmitted by the IUT.
Results: The IUT shall remain in state DS 1.11 (operational state), no LFA report shall be
detected by the simulator at V3 reference point.
NOTE 1: This test relies on the correct operation of the CRC error information report by the IUT.
Page 22
ETS 300 233: May 1994/A1 March 1995
C.2.6.2 Output jitter at V3 reference point
Test applicable at V3 reference point.
Purpose: To measure the jitter generated by the IUT.
Test configuration:
T V3
TX
RX TX RX
SIMULATOR
SIMULATOR
T IUT V3
REF.POINT REF.POINT
TX RX
RX TX
POW ER
POW ER
SOURCE SINK
T V3
Figure C.11: Test configuration for output jitter at V3 reference point
System state: State DS 1.11 (normal operation).
Stimulus: Normal operational frames with jitter according to the table C.8, provided to the
synchronizing input of the IUT (i.e. connected at T reference point to the access
digital section) and with a PRBS 2 - 1 in time slots 1 to 31. The PRBS
2 - 1 shall fill continuously all the frame except time slot 0 (net bit rate
1 984 kbit/s) with frequency variation in the range 2 048 kbit/s ± 5 ppm (two
different measurements).
Table C.8
Modulating frequency Input jitter
UI peak to peak
40 Hz 1,1
100 kHz 0,11
Monitor: The jitter extracted from the signal transmitted by the IUT.
Results: The peak to peak jitter shall comply with the limits given in CCITT
Recommendation G.823 [6].
Page 23
ETS 300 233: May 1994/A1 March 1995
C.2.6.3 Output jitter at T reference point
Test applicable at T reference point.
Purpose: To measure the jitter generated by the IUT.
Test configuration:
T V3
JITTE R
TX RX TX
MEASURE MEN T
UNIT
SIMULATOR
IUT V3
REF.POINT
RX
POW E R
POW ER
SO UR CE
SINK
T V3
Figure C.12: Test configuration for output jitter at T reference point
The jitter measurement shall be done using equipment that has an external timing reference to the jitter
measurement set which has no phase variation energy in the jitter region under test.
System state: State DS 1.11 (normal operat
...



