The present document is an aid for all integrators of Information and Communication Technologies (ICT) equipment to
minimize thermal problems. It establishes recommendations for the thermal management of racks/cabinets,
miscellaneous racks/cabinets and locations.
The present document considers telecommunication Central Office (CO) and Data Centers (DC) locations.
The present document considers only the thermal factors. The integrator should consider the thermal factors in
conjunction with the ETSI EN 300 019-1-3 [i.1] and other non-thermal factors.

Okoljski inženiring (EE) - Evropski telekomunikacijski standard za prakso pri opremi - Navodila za uravnavanje toplote za opremo in njena uporaba

Cilj tega dokumenta je pomoč vsem integratorjem opreme IKT pri zmanjševanju težav s toploto. Podana so priporočila za uravnavanje toplote za stojala/ohišja, druga stojala/ohišja in lokacije.
V tem dokumentu so upoštevane lokacije telekomunikacijskega osrednjega urada (CO) in podatkovnih središč (DC). V tem dokumentu so upoštevani samo toplotni dejavniki. Integrator naj bi upošteval toplotne dejavnike v povezavi s standardom ETSI EN 300 019-1-3 [i.1] in druge netoplotne dejavnike.

General Information

Status
Published
Publication Date
06-Jan-2016
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
05-Nov-2015
Due Date
10-Jan-2016
Completion Date
07-Jan-2016
Mandate

Buy Standard

Technical report
SIST-TP ETSI/TR 102 489 V1.4.1:2016
English language
45 pages
sale - 10%
Preview
sale - 10%
Preview

Standards Content (sample)

SLOVENSKI STANDARD
SIST-TP ETSI/TR 102 489 V1.4.1:2016
01-februar-2016
Okoljski inženiring (EE) - Evropski telekomunikacijski standard za prakso pri
opremi - Navodila za uravnavanje toplote za opremo in njena uporaba

Environmental Engineering (EE);European telecommunications standard for equipment

practice;Thermal management guidance for equipment and its deployment
Ta slovenski standard je istoveten z: TR 102 489 V1.4.1
ICS:
19.040 Preskušanje v zvezi z Environmental testing
okoljem
33.040.01 Telekomunikacijski sistemi Telecommunication systems
na splošno in general
SIST-TP ETSI/TR 102 489 V1.4.1:2016 en,fr,de

2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------
SIST-TP ETSI/TR 102 489 V1.4.1:2016
---------------------- Page: 2 ----------------------
SIST-TP ETSI/TR 102 489 V1.4.1:2016
ETSI TR 102 489 V1.4.1 (2015-10)
TECHNICAL REPORT
Environmental Engineering (EE);
European telecommunications standard for
equipment practice;
Thermal management guidance for
equipment and its deployment
---------------------- Page: 3 ----------------------
SIST-TP ETSI/TR 102 489 V1.4.1:2016
2 ETSI TR 102 489 V1.4.1 (2015-10)
Reference
RTR/EE-0164
Keywords
Energy Efficiency, environment, equipment
practice, rack
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88
Important notice
The present document can be downloaded from:
http://www.etsi.org/standards-search

The present document may be made available in electronic versions and/or in print. The content of any electronic and/or

print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any

existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the

print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat.

Users of the present document should be aware that the document may be subject to revision or change of status.

Information on the current status of this and other ETSI documents is available at

http://portal.etsi.org/tb/status/status.asp

If you find errors in the present document, please send your comment to one of the following services:

https://portal.etsi.org/People/CommiteeSupportStaff.aspx
Copyright Notification

No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying

and microfilm except as authorized by written permission of ETSI.

The content of the PDF version shall not be modified without the written authorization of ETSI.

The copyright and the foregoing restriction extend to reproduction in all media.
© European Telecommunications Standards Institute 2015.
All rights reserved.
TM TM TM

DECT , PLUGTESTS , UMTS and the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members.

3GPP and LTE™ are Trade Marks of ETSI registered for the benefit of its Members and

of the 3GPP Organizational Partners.

GSM® and the GSM logo are Trade Marks registered and owned by the GSM Association.

ETSI
---------------------- Page: 4 ----------------------
SIST-TP ETSI/TR 102 489 V1.4.1:2016
3 ETSI TR 102 489 V1.4.1 (2015-10)
Contents

Intellectual Property Rights ................................................................................................................................ 5

Foreword ............................................................................................................................................................. 5

Modal verbs terminology .................................................................................................................................... 5

Abstract ............................................................................................................................................................... 5

1 Scope ........................................................................................................................................................ 6

2 References ................................................................................................................................................ 6

2.1 Normative references ......................................................................................................................................... 6

2.2 Informative references ........................................................................................................................................ 6

3 Definitions and abbreviations ................................................................................................................... 7

3.1 Definitions .......................................................................................................................................................... 7

3.2 Abbreviations ..................................................................................................................................................... 7

4 ARCM integration overview .................................................................................................................... 8

5 Subrack integration in the same ARCM ................................................................................................... 8

5.1 Configuring equipment in an ARCM ................................................................................................................. 8

5.1.0 Introduction................................................................................................................................................... 8

5.1.1 Subrack location ........................................................................................................................................... 8

5.1.2 Cabling .......................................................................................................................................................... 9

5.2 Mechanical structure of ARCM ......................................................................................................................... 9

5.2.0 Introduction................................................................................................................................................... 9

5.2.1 Opening geometry for the airflow ................................................................................................................. 9

5.2.2 Equipment fastening in the ARCM ............................................................................................................. 10

5.2.3 Doors .......................................................................................................................................................... 10

5.3 ARCM cooling issues ....................................................................................................................................... 10

5.3.0 Introduction................................................................................................................................................. 10

5.3.1 Cooling equipment including fans .............................................................................................................. 10

5.3.2 Air Cooling techniques ............................................................................................................................... 10

5.3.3 Air filtering ................................................................................................................................................. 11

5.4 Impact of the implementation of subracks in an ARCM .................................................................................. 11

5.5 Impact of the temperature on equipment reliability ......................................................................................... 12

6 ARCM integration in the same telecommunications equipment or Data centre room ........................... 12

6.1 Positioning the ARCM in a room ..................................................................................................................... 12

6.1.0 Introduction................................................................................................................................................. 12

6.1.1 Room layout................................................................................................................................................ 13

6.1.2 Cabling ........................................................................................................................................................ 13

6.1.3 Cooling systems .......................................................................................................................................... 14

6.2 Mechanical structure of ARCMs in the rows ................................................................................................... 15

6.2.1 Opening geometry for the airflow ............................................................................................................... 15

6.3 Cooling systems for a room .............................................................................................................................. 15

6.3.1 General design considerations .................................................................................................................... 15

6.3.2 Cooling techniques ..................................................................................................................................... 15

6.3.2.0 Introduction ........................................................................................................................................... 15

6.3.2.1 Passive cooling ...................................................................................................................................... 15

6.3.2.2 Warm air extraction (without cool air) .................................................................................................. 16

6.3.2.3 Fresh air supply with natural release via pressure relief ventilators ...................................................... 17

6.3.2.4 Cool air blowing (with or without relative humidity control) ............................................................... 18

6.3.3 Room air paths ............................................................................................................................................ 20

6.3.3.1 Room air supply .................................................................................................................................... 20

6.3.3.1.0 Introduction ..................................................................................................................................... 20

6.3.3.1.1 Free blow ......................................................................................................................................... 20

6.3.3.1.2 Overhead distribution ...................................................................................................................... 20

6.3.3.1.3 Raised floor distribution .................................................................................................................. 20

6.3.3.2 Return air path ....................................................................................................................................... 21

6.3.3.2.1 Direct return to side walls at side/end of room ................................................................................ 21

ETSI
---------------------- Page: 5 ----------------------
SIST-TP ETSI/TR 102 489 V1.4.1:2016
4 ETSI TR 102 489 V1.4.1 (2015-10)

6.3.3.2.2 Overhead return ............................................................................................................................... 21

7 Thermal evaluation of the equipment/room architecture ....................................................................... 21

8 Temperature reference point .................................................................................................................. 22

8.0 Introduction ...................................................................................................................................................... 22

8.1 Temperature measurement point for rack ......................................................................................................... 23

8.2 Temperature measurement point for aisle ........................................................................................................ 23

Annex A: Examples of cooling systems in an ARCM in use prior to ETSI EN 300 119-5 .............. 24

A.0 General ................................................................................................................................................... 24

A.1 Single subrack cooling ........................................................................................................................... 24

A.1.0 Introduction ...................................................................................................................................................... 24

A.1.1 Air outlet located at the top of the ARCM ....................................................................................................... 24

A.1.2 Air outlet located at the front of the ARCM ..................................................................................................... 25

A.2 Multiple subrack cooling ........................................................................................................................ 26

A.2.0 Introduction ...................................................................................................................................................... 26

A.2.1 Serial cooling .................................................................................................................................................... 26

A.2.2 Parallel airflow with air inlet located at the front or the bottom of the ARCM ................................................ 27

A.2.3 Parallel airflow with air inlet located at the sides of the rack ........................................................................... 29

A.3 300 mm cabinet ARCM thermal solution .............................................................................................. 30

A.3.0 Introduction ...................................................................................................................................................... 30

A.3.1 Current 300 mm ARCM thermal solutions ...................................................................................................... 30

A.3.2 Alternative 300 mm cabinet solution................................................................................................................ 31

A.3.3 Simulation test result about proposed thermal solution .................................................................................... 32

A.3.3.1 Mock-up configuration ............................................................................................................................... 32

A.3.3.2 Component test result ................................................................................................................................. 33

A.3.4 Air deflector design .......................................................................................................................................... 33

A.3.4.1 Key factors in air deflector design .............................................................................................................. 33

A.3.4.2 Different air deflector mock-up test ............................................................................................................ 33

Annex B: Example of ARCM cooling systems in a room ................................................................... 36

B.1 Room - serial cooling ............................................................................................................................. 36

B.2 Room - parallel cooling .......................................................................................................................... 36

B.3 ETSI 300 mm ARCM in Central Office ................................................................................................ 37

B.3.0 Introduction ...................................................................................................................................................... 37

B.3.1 ETSI 300 mm ARCM solution ......................................................................................................................... 37

B.3.2 ETSI 300 mm ARCM in CO ............................................................................................................................ 38

B.3.3 Alternative ETSI 300 mm ARCM instalment in CO ........................................................................................ 39

B.3.3.0 Introduction................................................................................................................................................. 39

B.3.3.1 Simulation equipment configuration ........................................................................................................... 40

B.3.3.2 Simulation results ....................................................................................................................................... 40

B.3.3.3 Proposed CO arrangement .......................................................................................................................... 41

B.3.3.4 300 mm ARCM in CO simulation .............................................................................................................. 42

Annex C: Bibliography .......................................................................................................................... 44

History .............................................................................................................................................................. 45

ETSI
---------------------- Page: 6 ----------------------
SIST-TP ETSI/TR 102 489 V1.4.1:2016
5 ETSI TR 102 489 V1.4.1 (2015-10)
Intellectual Property Rights

IPRs essential or potentially essential to the present document may have been declared to ETSI. The information

pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found

in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in

respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web

server (http://ipr.etsi.org).

Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee

can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web

server) which are, or may be, or may become, essential to the present document.
Foreword

This Technical Report (TR) has been produced by ETSI Technical Committee Environmental Engineering (EE).

The present document applies to all telecommunications racks/cabinets, miscellaneous racks/cabinets and subracks

forming part of the public telecommunications network and defined in ETSI EN 300 119-1 [i.3], ETSI

EN 300 119-2 [i.4], ETSI EN 300 119-3 [i.5], ETSI EN 300 119-4 [i.6] and ETSI EN 300 119-5 [i.7]

The present document applies also to telecom and data centre room installations.
Modal verbs terminology

In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and

"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of

provisions).

"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.

Abstract

It is often necessary to integrate different subracks into the same rack/cabinet and different racks/cabinets into a

common equipment room sharing the common room environment. The integration between equipment and the room is

increasingly more important. The present document is intended to provide assistance in integration of equipment and

room environment to ensure that the equipment has the required environment and that each equipment rack/cabinet is

not detrimental to the other equipment in the locality.

It should be an aid for all integrators and designers with their different elementary knowledge to integrate.

ETSI
---------------------- Page: 7 ----------------------
SIST-TP ETSI/TR 102 489 V1.4.1:2016
6 ETSI TR 102 489 V1.4.1 (2015-10)
1 Scope

The present document is an aid for all integrators of Information and Communication Technologies (ICT) equipment to

minimize thermal problems. It establishes recommendations for the thermal management of racks/cabinets,

miscellaneous racks/cabinets and locations.

The present document considers telecommunication Central Office (CO) and Data Centers (DC) locations.

The present document considers only the thermal factors. The integrator should consider the thermal factors in

conjunction with the ETSI EN 300 019-1-3 [i.1] and other non-thermal factors.
2 References
2.1 Normative references

References are either specific (identified by date of publication and/or edition number or version number) or

non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the

reference document (including any amendments) applies.

Referenced documents which are not found to be publicly available in the expected location might be found at

http://docbox.etsi.org/Reference.

NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee

their long term validity.

The following referenced documents are necessary for the application of the present document.

Not applicable.
2.2 Informative references

References are either specific (identified by date of publication and/or edition number or version number) or

non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the

reference document (including any amendments) applies.

NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee

their long term validity.

The following referenced documents are not necessary for the application of the present document but they assist the

user with regard to a particular subject area.

[i.1] ETSI EN 300 019-1-3: "Environmental Engineering (EE); Environmental conditions and

environmental tests for telecommunications equipment; Part 1-3: Classification of environmental

conditions; Stationary use at weatherprotected locations".

[i.2] CENELEC EN 60950-1 (2006): "Information technology equipment - Safety - Part 1: General

requirements".

[i.3] ETSI EN 300 119-1: "Environmental Engineering (EE); European telecommunication standard for

equipment practice; Part 1: Introduction and terminology".

[i.4] ETSI EN 300 119-2: "Environmental Engineering (EE); European telecommunication standard for

equipment practice; Part 2: Engineering requirements for racks and cabinets".

[i.5] ETSI EN 300 119-3: "Environmental Engineering (EE); European telecommunication standard for

equipment practice; Part 3: Engineering requirements for miscellaneous racks and cabinets".

[i.6] ETSI EN 300 119-4: "Environmental Engineering (EE); European telecommunication standard for

equipment practice; Part 4: Engineering requirements for subracks in miscellaneous racks and

cabinets".
ETSI
---------------------- Page: 8 ----------------------
SIST-TP ETSI/TR 102 489 V1.4.1:2016
7 ETSI TR 102 489 V1.4.1 (2015-10)

[i.7] ETSI EN 300 119-5: "Environmental Engineering (EE); European telecommunication standard for

equipment practice; Part 5: Thermal management".

[i.8] ETSI EN 300 386: "Electromagnetic compatibility and Radio spectrum Matters (ERM);

Telecommunication network equipment; ElectroMagnetic Compatibility (EMC) requirements".

[i.9] IEC TR 62380: "Reliability data handbook - Universal model for reliability prediction of

electronics components, PCBs and equipment".
[i.10] Recommendation ITU-T L.1300: "Best practices for green data centers".
[i.11] ASHRAE TC9.9.
NOTE: Available at http://tc99.ashraetcs.org/.

[i.12] ETSI ES 202 336-12: "Environmental Engineering (EE); Monitoring and control interface for

infrastructure equipment (power, cooling and building environment systems used in

telecommunication networks); Part 12: ICT equipment power, energy and environmental

parameters monitoring information model".
3 Definitions and abbreviations
3.1 Definitions

For the purposes of the present document, the following terms and definitions apply:

ambient: spatial maximal temperature of the air entering the rack/cabinet
NOTE: As defined in ETSI EN 300 019-1-3 [i.1].

cabinet: free-standing and self-supporting enclosure for housing electrical and/or electronic equipment

NOTE: It is usually fitted with doors and/or panels which may or may not be removable.

equipment: equipped subracks, racks/cabinets and miscellaneous racks/cabinets

integrator: end user/operator of telecommunication or IT equipment or their agent

NOTE: For example, an equipment manufacturer could be an operator's agent.

micro-climate: conditions found within the rack/cabinet/miscellaneous rack/cabinet creating a local ambient for the

subrack

NOTE: In practice this will typically result in elevated temperatures and reduced relative humidities to those

quoted in ETSI EN 300 019-1-3 [i.1].

Miscellaneous Rack/Cabinet (MRC): cabinet that accommodates subracks of several different types of equipment and

suppliers
NOTE: It is freely configurable by the Integrator.

rack: free-standing or fixed structure for housing electrical and/or electronic equipment

3.2 Abbreviations
For the purposes of the present document, the following abbreviations apply:
AC Air Cooling
AHU Air Handling Unit
ARCM Any Rack, Cabinet and Miscellaneous rack/cabinet
ASHRAE American Society of Heating, Refrigeration and Air-conditioning Engineers
CFM Cubic Feet to Minute
CO Central Office
CRAC Computer Room Air Conditioner
ETSI
---------------------- Page: 9 ----------------------
SIST-TP ETSI/TR 102 489 V1.4.1:2016
8 ETSI TR 102 489 V1.4.1 (2015-10)
DC Data Centre
DT Data Temperature
EMC Electro Magnetic Compatibility
HVAC Heating, Ventilation & Air Conditioning
ICT Information and Communication Technology
MRC Miscellaneous Rack/Cabinet
PDU Poer Distribution Unit
4 ARCM integration overview
The integration can be broken down into:
• Positioning equipment in ARCMs including routing the cables.

• Analysing the possible impact of thermal issues on the configuration of racks/cabinets (e.g. location of

racks/cabinets) and MRCs (e.g. location, openings, placement of baffles).
• Providing the cooling solutions.
During the integration the following parameters have to be taken into account:
• The available volume.
• The maximum ambient temperature/micro-climate.
• The provision of coherent air flow to avoid hot spots.
• The functional thermal limits of equipment.
• The cabling space.

The overall cooling effectiveness needed depends in principle on the type of equipment to be cooled and thermal

requirements to be complied with.

Special attention should be taken to check the impact of the installation of different equipment in the same ARCM on

their functional thermal limits.

It is often very helpful to check, by suitable hand calculation, thermal simulation and measurement, whether the

integration is applicable for the purpose.
5 Subrack integration in the same ARCM
5.1 Configuring equipment in an ARCM
5.1.0 Introduction

This activity consists of choosing how to combine the different subracks and the cabling in the ARCM.

5.1.1 Subrack location
This phase consists of positioning the different subracks in the ARCM.
The distribution of subracks should take into account the following parameters:

• Maximum power dissipated by the equipment for the maximum traffic load or its intended operational state.

For instance, knowledge of the maximum power dissipated will allow the integrator to locate the highest

dissipating subracks at the top of the ARCM in order to minimize the increase of temperature experienced by

the other subracks.

• Subracks working maximum temperature: For example, subracks which withstand high temperature can be

installed at upper part of the ARCM (where generally the temperature is the highest).

ETSI
---------------------- Page: 10 ----------------------
SIST-TP ETSI/TR 102 489 V1.4.1:2016
9 ETSI TR 102 489 V1.4.1 (2015-10)

• Thermal restrictions of each subrack. If possible, place the most restrictive subrack in an area not heated by

other subracks, for example, at the bottom in an ARCM with natural convection cooling system, or in an area

receiving fresh air with as high an air velocity as necessary.

• The position and area of air inlet and air outlet for the different subracks. The porosity of the surface and the

obstacles to the airflow in front of the ventilation surface should also be taken int

...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.