Activities during the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) for automation systems in the process industry

defines procedures and specifications for the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification.

General Information

Status
Replaced
Publication Date
27-Jan-2004
Current Stage
DELPUB - Deleted Publication
Completion Date
15-Nov-2006
Ref Project

Relations

Buy Standard

Technical specification
iecpas62381{ed1.0}en - IEC PAS 62381:2004 - Activities during the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) for automation systems in the process industry Released:1/28/2004 Isbn:2831873835
English language
35 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)


PUBLICLY
IEC
AVAILABLE
PAS 62381
SPECIFICATION
First edition
Pre-Standard
2004-01
Activities during the factory acceptance
test (FAT), site acceptance test (SAT),
and site integration test (SIT)
for automation systems
in the process industry
Reference number
IEC/PAS 62381:2004(E)
Publication numbering
As from 1 January 1997 all IEC publications are issued with a designation in the
60000 series. For example, IEC 34-1 is now referred to as IEC 60034-1.

Consolidated editions
The IEC is now publishing consolidated versions of its publications. For example,
edition numbers 1.0, 1.1 and 1.2 refer, respectively, to the base publication, the
base publication incorporating amendment 1 and the base publication incorporating
amendments 1 and 2.
Further information on IEC publications
The technical content of IEC publications is kept under constant review by the IEC,
thus ensuring that the content reflects current technology. Information relating to
this publication, including its validity, is available in the IEC Catalogue of
publications (see below) in addition to new editions, amendments and corrigenda.
Information on the subjects under consideration and work in progress undertaken
by the technical committee which has prepared this publication, as well as the list
of publications issued, is also available from the following:
• IEC Web Site (www.iec.ch)
• Catalogue of IEC publications
The on-line catalogue on the IEC web site (www.iec.ch/searchpub) enables you to
search by a variety of criteria including text searches, technical committees
and date of publication. On-line information is also available on recently issued

publications, withdrawn and replaced publications, as well as corrigenda.
• IEC Just Published
This summary of recently issued publications (www.iec.ch/online_news/ justpub)
is also available by email. Please contact the Customer Service Centre (see
below) for further information.
• Customer Service Centre
If you have any questions regarding this publication or need further assistance,
please contact the Customer Service Centre:

Email: custserv@iec.ch
Tel: +41 22 919 02 11
Fax: +41 22 919 03 00
PUBLICLY
IEC
AVAILABLE
PAS 62381
SPECIFICATION
First edition
Pre-Standard
2004-01
Activities during the factory acceptance
test (FAT), site acceptance test (SAT),
and site integration test (SIT)
for automation systems
in the process industry
© IEC 2004 ⎯ Copyright - all rights reserved
No part of this publication may be reproduced or utilized in any form or by any means, electronic or
mechanical, including photocopying and microfilm, without permission in writing from the publisher.
International Electrotechnical Commission, 3, rue de Varembé, PO Box 131, CH-1211 Geneva 20, Switzerland
Telephone: +41 22 919 02 11 Telefax: +41 22 919 03 00 E-mail: inmail@iec.ch Web: www.iec.ch
PRICE CODE
Commission Electrotechnique Internationale V

International Electrotechnical Commission
МеждународнаяЭлектротехническаяКомиссия
For price, see current catalogue

– 2 – PAS 62381 © IEC:2004 (E)

CONTENTS
FOREWORD .3

INTRODUCTION.3

1 Scope .5

2 Definitions.8

3 Abbreviations.9

4 General preparation before conducting the FAT.10

4.1 Documents typically prepared by the OWNER/CONTRACTOR .10

4.2 Documents typically prepared by the VENDOR .10
5 Factory acceptance test .10
5.1 General.10
5.2 Test schedule .11
5.3 Test procedure .11
5.4 FAT rework.14
5.5 Documentation of FAT in accordance with Annex A.14
6 Site acceptance test.14
6.1 General.14
6.2 Test schedule .15
7 Site integration test.15
7.1 General.15
7.2 Test schedule .15
Annex A (informative) FAT checklists .16
A.1 Documentation check.16
A.2 HW and SW inventory check .16
A.3 Mechanical inspection.17
A.4 Wiring and termination inspection .18
A.5 Start-up text and general system functions.19
A.6 System alarm test.20
A.7 Hardware redundancy and diagnostic check .21
A.8 Visualization/operation .22
A.9 Test of functionality against FBD, FUP, etc. .23
A.10 Complex functionality and operation modes .25

A.11 Integration of subsystems .26
Annex B (informative) SAT checklist.27
Annex C (informative) SIT checklist .28
Annex D (informative) Factory acceptance test certificate.29
Annex E (informative) Site acceptance test certificate.30
Annex F (informative) Site integration test certificate.31
Annex G (informative) Automation system acceptance certificate.32
Annex H (informative) FAT punch list.33
Annex I (informative) SAT punch list .34
Annex J (informative) SIT punch list.35

PAS 62381 © IEC:2004 (E) – 3 –

INTERNATIONAL ELECTROTECHNICAL COMMISSION

____________
ACTIVITIES DURING THE FACTORY ACCEPTANCE TEST (FAT),

SITE ACCEPTANCE TEST (SAT), AND SITE INTEGRATION TEST (SIT)

FOR AUTOMATION SYSTEMS IN THE PROCESS INDUSTRY

FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising

all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
international co-operation on all questions concerning standardization in the electrical and electronic fields. To

this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC
Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested
in the subject dealt with may participate in this preparatory work. International, governmental and non-
governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
with the International Organization for Standardization (ISO) in accordance with conditions determined by
agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence
between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
the latter.
5) IEC provides no marking procedure to indicate its approval and cannot be rendered responsible for any
equipment declared to be in conformity with an IEC Publication.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
members of its technical committees and IEC National Committees for any personal injury, property damage or
other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
indispensable for the correct application of this publication.
9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of
patent rights. IEC shall not be held responsible for identifying any or all such patent rights.
A PAS is a technical specification not fulfilling the requirements for a standard but made available to
the public.
IEC-PAS 62381 has been processed by IEC technical committee 65: Industrial-process measurement
and control.
The text of this PAS is based on the This PAS was approved for publication
following document: by the P-members of the committee
concerned as indicated in the following
document
Draft PAS Report on voting
65/309/PAS 65/322/RVD
Following publication of this PAS, which is a pre-standard publication, the technical committee or
subcommittee concerned will transform it into an International Standard.

– 4 – PAS 62381 © IEC:2004 (E)

INTRODUCTION
There is an increasing trend in the process industry to shorten the time period for project execution. At

the same time, the complexity of automation systems is being increased due to the number of

connected systems and the use of new technologies, for example, fieldbus systems.

Experience has shown that the owner, the contractor and the vendor have long and extensive

discussions to unambiguously lay down the scope of activities and responsibilities in order to achieve
a timely delivery and acceptance of automation systems.

This document should lead to an improvement and acceleration of the negotiation phase and to a

mutual understanding about the scope of activities of each party.

This document does not reflect the additional interests of industries which are subject to special
requirements such as validation.
The annexes of this standard contain forms which may be used in the test procedures. They are
attached to this publication in Excel format. Buyers of this publication may copy these forms for their
own purposes only in the required amount.
The IEC sells read-only PDF files as a general rule. In the present instance, and quite exceptionally,
to enable the user to fill in the forms, a revisable file is included in a pocket affixed to the back cover of
this publication. Please use the zip/unzip function.
This file can also be downloaded from the Web as a PDF file.

PAS 62381 © IEC:2004 (E) – 5 –

ACTIVITIES DURING THE FACTORY ACC
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.